Customer: Infrabel (ETCS)
Place of execution : Belgique
Project’s duration : 2004 à 2009

Certifer's mission 

  • Trackside level-1 ETCS equipment with reopening function
  • Consistence with adjacent trackside level-2 ETCS equipment
  • Integration within the existing signaling system.

Control of the interoperability of high-speed lines’ signaling system, on L3 (Liège – Hammerbrucke) and L4 lines (Anvers – Border with Netherlands), I-ranked lines as per the CCS TSI.

In order to appreciate the compliance of the system’s behavior when shifting from level 1 to level 2, the approach zones (around 5 km) at the border of L3 and L4 are included in the assessment.

CERTIFER’s personnel :

1 Project Manager and 2 experts

*

*

*

*

*

*


: