CERTIFER SA
18 RUE EDMOND MEMBREE
59308  Valenciennes
N°TVA : 73411047285
 

Client:Eiffage Rail Express
Location: Bretagne Pays de la Loire (France)
Project duration: 2012- 2018
Team: 1 Project Manager and 8 Assessors

DESCRIPTION OF THE PROJECT

  • The Bretagne-Pays de la Loire line is a high-speed line (LGV) linking Rennes (Ille-et-Vilaine) to Connerré (Sarthe).
  • It operates at speeds of up to 320 km/h in France and the infrastructure will also be designed to run at up to 350 km/h.
  • The LGV Bretagne-Pays de la Loire is an extension of the western branch of the existing LGV Atlantique to the cities of Rennes and Nantes.
  • With a length of 182 km and 32 km of additional connections with the existing line, this new line aims to significantly improve service to Brittany and the Pays de la Loire and to strengthen their accessibility.
  • This LGV entered commercial service on July 2, 2017 and has significantly reduced travel time between the regions.

*

*

*

*

*

*

CERTIFER's missions

In the framework of this leading High Speed Line project, CERTIFER has worked closely with EIFFAGE RAIL EXPRESS, from the design to the commissioning of the line (operation and maintenance aspects are also included in the scope of work), the scope of intervention covered the assessment of the following aspects according to TSIs and the French national rules:

Notified Body Mission (NoBo)

  • The NoBo mission consists in assessing the compliance of the project with requirements from the Technical ▪ The NoBo mission of CERTIFER consisted in assessing the compliance of the project with requirements from the TSIs as stipulated in the 2008/57/EC directive on the interoperability of the trans-European high- speed rail system and covered the following subsystems:  Control-Command & Signaling (trackside), Energy, Infrastructure

Designated Body Mission (DeBo)

  • The DeBo mission consists in assessing the compliance of the project with the Notified National Technical Rules (NNTR), the following structural and functional subsystems are under assessment: Infrastructure, Power supply, Control Command and Signaling, Operation and Maintenance.

:

Top
Changing Cookie Settings

Dear users, this website stores cookies on your computer. Their purpose is to improve your website experience while providing you with more personalized services.

If you would like more information about the cookies we use, please see our Privacy Policy. By accepting cookies, you consent to their use. You can also adjust their settings.

If you refuse cookies, your information will not be tracked when you visit this site. Only one cookie will be used in your browser to remember your preference not to be tracked.

  • Change the parameters
  • Accept all cookies and continue to the website