CERTIFER SA
18 RUE EDMOND MEMBREE
59308  Valenciennes
N°TVA : 73411047285
 

09/02/2022

CERTIFER, in a joint venture with Bureau Veritas, has carried out the EC interoperability verification of the new Lubián - Orense high-speed section

CERTIFER, in a joint venture with Bureau Veritas, has carried out the EC interoperability verification of the new Lubián - Orense high-speed section for the Energy and Infrastructure subsystems
 
Last 21st December a new section of the Madrid - Galicia High Speed Line, Pedralba - Orense, was inaugurated, connecting Ourense with the capital of Madrid in 2 hours and 15 minutes.
 
With 31 tunnels and 32 viaducts, which reflect the rugged Galician terrain, this is the most complex section of the line. It has been designed for a high-speed double-track platform, with some sections of separate platforms, and with a maximum speed of 300 km/h. Two types of tracks have been installed: slab track (prefabricated and bi-block sleepers) and ballasted track. In this phase, the marshalling yard at Orense station has been remodelled to accommodate the high-speed tracks. In a later phase, access to Ourense will be via a bypass outside the city, at which time a new station will be built.

Top
Dear users, this website stores cookies on your computer. Their purpose is to improve your website experience while providing you with more personalized services. Cookies are also used for ads personalisation.

If you would like more information about the cookies we use, please see our Privacy Policy. By accepting cookies, you consent to their use. You can also adjust their settings. If you refuse cookies, your information will not be tracked when you visit this site. Only one cookie will be used in your browser to remember your preference not to be tracked.
Edit cookies setting