CERTIFER SA
18 RUE EDMOND MEMBREE
59308  Valenciennes
N°TVA : 73411047285
 

Client: Entreprise Metro d'Alger
Location: Sétif, Algeria
Total project duration: 2013 - ongoing

Project description

The first tramway line of Mostaganem, 14.2 km long, is composed of 2 sections:

  • The first section connects the "Salamandre" sector to the "Kharouba" sector, 12.2 km long and with 20 stations.
  • The second section connects the SNTF station to the new bus station, 2 km long and with 4 stations.

Ben je geïnteresseerd in dit product. Laat ons uw adres en telefoonnummer gecontacteerd te worden door onze diensten.

Naam *

Voornaam *

Bedrijf *

Postcode *

E-mail *

Telefoon *

* Vul alle verplichte velden

CERTIFER mission

The evaluation covers the following phases:

  • Phase 1: Design of the installations and manufacturing of the equipment
  • Phase 2: Manufacturing - Installation
  • Phase 3: Tests and trials
  • Phase 4: Preparation for operation
  • Phase 5: Commissioning (Safety file)
  • Phase 5.1 Partial safety file
  • Phase 5.2: Completion of the safety file
Geen bijkomende informatie
Gelijkaardig(e) artikel(s)
producten 1 tot 8 op 17 |

Misschien bent u ook geïnteresseerd in de volgende producten :

Top
Beste gebruikers, deze site bewaart cookies op uw computer. Het doel is om uw ervaring op onze website te verbeteren en u tegelijkertijd meer gepersonaliseerde diensten aan te bieden. Cookies worden ook gebruikt voor het personaliseren van advertenties.

Als u meer informatie wilt over de cookies die wij gebruiken, raadpleeg dan ons Privacybeleid. Door cookies te accepteren, stemt u in met het gebruik ervan. U kunt de instellingen van de cookies ook aanpassen. Als u weigert, worden uw gegevens niet bijgehouden wanneer u deze site bezoekt. Er wordt slechts één cookie gebruikt in uw browser om uw voorkeur dat u niet gevolgd wilt worden te onthouden.
Alles weigeren
Instellingen aanpassen
Sta alles toe
Cookie-instelling bewerken