CERTIFER SA
18 RUE EDMOND MEMBREE
59308  Valenciennes
N°TVA : 73411047285
 

Client : Saudi Railways Organization
Country: SAUDI ARABIA
Location: Dammam - Riyadh
Project duration : 06.2012 - 06.2013
Kilometers: 14.2
Team : 1 Project Manager and 8 experts

PROJECT'S DESCRIPTION

The Saudi Railways Organization (SRO) operates a railway network comprising 1,380 kilometers of track, extending from King Abdul Aziz Port in Dammam and the City of Dammam itself (on the East coast of the Kingdom) to Riyadh, passing by Abqaiq, Hofuf, Haradh, Al-Tawdhihiyah and Al-Kharj. In addition, some auxiliary lines, branches from the SRO’s main lines, link some industrial and agricultural areas and military sites with export ports and residential areas. In order to shorten the time trip between Dammam and Riyadh and increase the network’s capacity, SRO undertook a wide program of modernization and upgrading including the installation of modern signalling system (ETCS level 1) and telecommunication GSM-R system, procurement of 8 new DMU (CAF) push-pull trains designated for a maximum speed of 200km/h, upgrading the line from Dammam to Hofuf for the maximum speed of 160 km/h , upgrading the line from Hofuf to Riyadh for the maximum speed of 200 km/h and operational speed of 180km/, doubling the line between Hofuf and Riyadh, diverging the line outside Hofuf city from km 114+700 to km 163+300, protecting the line from intrusions by steel wire fence, hiring consultant to develop Safety Management System (SMS) and new operating plan when starting the new passenger services.

Ben je geïnteresseerd in dit product. Laat ons uw adres en telefoonnummer gecontacteerd te worden door onze diensten.

Naam *

Voornaam *

Bedrijf *

Postcode *

E-mail *

Telefoon *

* Vul alle verplichte velden

SCOPE OF WORK

In this context, CERTIFER was involved as an Independent Competent Person (ICP) to review the SRO’s SMS and perform the independent certification of design and safety verification by using documentary evidence supplied by SRO for civil works and other railway infrastructure, control systems, equipment, rolling stock, etc. This verification included Specification, Design, Test and acceptance and Maintainability.

Geen bijkomende informatie
Gelijkaardig(e) artikel(s)

Misschien bent u ook geïnteresseerd in de volgende producten :

Top
Beste gebruikers, deze site bewaart cookies op uw computer. Het doel is om uw ervaring op onze website te verbeteren en u tegelijkertijd meer gepersonaliseerde diensten aan te bieden. Cookies worden ook gebruikt voor het personaliseren van advertenties.

Als u meer informatie wilt over de cookies die wij gebruiken, raadpleeg dan ons Privacybeleid. Door cookies te accepteren, stemt u in met het gebruik ervan. U kunt de instellingen van de cookies ook aanpassen. Als u weigert, worden uw gegevens niet bijgehouden wanneer u deze site bezoekt. Er wordt slechts één cookie gebruikt in uw browser om uw voorkeur dat u niet gevolgd wilt worden te onthouden.
Alles weigeren
Instellingen aanpassen
Sta alles toe
Cookie-instelling bewerken