CERTIFER SA
18 RUE EDMOND MEMBREE
59308  Valenciennes
N°TVA : 73411047285
 

09/02/2022

CERTIFER a réalisé la vérification d'interopérabilité EC de la nouvelle section à grande vitesse Lubián - Orense

CERTIFER, in a joint venture with Bureau Veritas, has carried out the EC interoperability verification of the new Lubián - Orense high-speed section for the Energy and Infrastructure subsystems
 
Last 21st December a new section of the Madrid - Galicia High Speed Line, Pedralba - Orense, was inaugurated, connecting Ourense with the capital of Madrid in 2 hours and 15 minutes.
 
With 31 tunnels and 32 viaducts, which reflect the rugged Galician terrain, this is the most complex section of the line. It has been designed for a high-speed double-track platform, with some sections of separate platforms, and with a maximum speed of 300 km/h. Two types of tracks have been installed: slab track (prefabricated and bi-block sleepers) and ballasted track. In this phase, the marshalling yard at Orense station has been remodelled to accommodate the high-speed tracks. In a later phase, access to Ourense will be via a bypass outside the city, at which time a new station will be built.

Top
Chers utilisateurs, ce site stocke les cookies sur votre ordinateur.

Ils ont pour but d'améliorer l’expérience de votre site Web, tout en vous fournissant des services plus personnalisés. Les cookies sont également utilisés pour la personnalisation des publicités. Si vous souhaitez plus d’informations sur les cookies que nous utilisons, veuillez consulter notre Politique de confidentialité. En acceptant les cookies, vous consentez à leur utilisation. Vous pouvez également paramétrer ces derniers. Si vous refusez, vos informations ne seront pas suivies, au moment de visiter ce site. Un seul cookie sera utilisé dans votre navigateur pour mémoriser votre préférence de ne pas être suivi.
Paramètres cookies