CERTIFER SA
18, Rue Edmond Membrée
 |  59300  Valenciennes  | 

24/11/2017

Metro de Santiago S.A. s line 6 (Chile), for which CERTIFER performed an ISA mission, has been commissioned on November 2nd.

In 2012, Metro de Santiago awarded Certifer for the Independent Safety Assessment of line 6. Certifer carried out the project according CENELEC standards and assessed in this framework the global transit system and several subsystems, including Rolling stock, CBTC, Platform screen doors, Track and catenary, Control Center, Ventilation and fire detection systems, Operation and Maintenance and also Interfaces with the previous subsystems.
 
With 10 undergrounds stations, this new 15 km line of Metro de Santiago will improve the connectivity of the network as the commuting time from Los Leones to Cerrillos station will only take 19 minutes (vs. 47 minutes previously) and is expected to benefit to one million habitants.
 
This line is part of an important investment program which intends to extend the network from 103 km to 174 km by 2025.
5.
Top
Ajustes de la configuración de las cookies

Estimados usuarios, este sitio web almacena las cookies en su computadora. Su objetivo es mejorar la experiencia de su sitio web, así como permitir servicios más personalizados.

Si desea obtener más información sobre las cookies que utilizamos, consulte nuestra Política de privacidad. By accepting cookies, you consent to their use. You can also adjust their settings. Al aceptar las cookies, acepta su uso. También puedes configurarlas.

Si se niega, su información no será seguida cuando visite este sitio. Se usará una única cookie en su navegador para recordar su preferencia de no ser seguido.

  • Ajustar parámetros
  • Aceptar todas las cookies y continuar al sitio