CERTIFER SA
18 RUE EDMOND MEMBREE
59308  Valenciennes
N°TVA : 73411047285
 

Client: Entreprise Metro d'Alger
Location: Sétif, Algeria
Total project duration: 2013 - ongoing

Project description

The first tramway line of Mostaganem, 14.2 km long, is composed of 2 sections:

  • The first section connects the "Salamandre" sector to the "Kharouba" sector, 12.2 km long and with 20 stations.
  • The second section connects the SNTF station to the new bus station, 2 km long and with 4 stations.

Te interesado este producto ? Déjenos sus señas para ser recontactado por nuestros servicios.

Apellido *

Nombre *

Empresa *

Código postal *

Email *

Teléfono *

* Please fill all the compulsory fields

CERTIFER mission

The evaluation covers the following phases:

  • Phase 1: Design of the installations and manufacturing of the equipment
  • Phase 2: Manufacturing - Installation
  • Phase 3: Tests and trials
  • Phase 4: Preparation for operation
  • Phase 5: Commissioning (Safety file)
  • Phase 5.1 Partial safety file
  • Phase 5.2: Completion of the safety file
No hay información adicional
Artículo(s) similar(es)

También le pueden interesar los siguientes productos :

Top
Ajustes de la configuración de las cookies

Estimados usuarios, este sitio web almacena las cookies en su computadora. Su objetivo es mejorar la experiencia de su sitio web, así como permitir servicios más personalizados.

Si desea obtener más información sobre las cookies que utilizamos, consulte nuestra Política de privacidad. By accepting cookies, you consent to their use. You can also adjust their settings. Al aceptar las cookies, acepta su uso. También puedes configurarlas.

Si se niega, su información no será seguida cuando visite este sitio. Se usará una única cookie en su navegador para recordar su preferencia de no ser seguido.

  • Ajustar parámetros
  • Aceptar todas las cookies y continuar al sitio