Customer: Infrabel (ETCS)
Place of execution : Belgique
Project’s duration : 2004 à 2009
Certifer's mission
- Trackside level-1 ETCS equipment with reopening function
- Consistence with adjacent trackside level-2 ETCS equipment
- Integration within the existing signaling system.
Control of the interoperability of high-speed lines’ signaling system, on L3 (Liège – Hammerbrucke) and L4 lines (Anvers – Border with Netherlands), I-ranked lines as per the CCS TSI.
In order to appreciate the compliance of the system’s behavior when shifting from level 1 to level 2, the approach zones (around 5 km) at the border of L3 and L4 are included in the assessment.
CERTIFER’s personnel :
1 Project Manager and 2 experts