CERTIFER SA
18 RUE EDMOND MEMBREE
59308  Valenciennes
N°TVA : 73411047285
 

Client: Société du Grand Paris
Country : France
Location : Paris region
Project duration : 2014- 2030
Kilometers : 64
Team : 1 Project Manager and 18 experts

Project description

The project consists in the creation of the 4 automatic metro lines without driver 15, 16, L17 and L18 of the Grand Paris.

L15 SOUTH - Noisy Champs / Pont de Sèvres:

- 16 stations,

- Approximately 33 km of tunnel (including connections to maintenance sites),

- Short train (3 cars) and long train (6 cars).

L15 WEST - Pont de Sèvre / St Denis Pleyel:

- 9 stations

- Approximately 21km of tunnel

- Long train (6 cars)

- 2 Tonçons 2025 and 2027

L15 EAST - St Denis Pleyel / Champygny Centre:

- 10 stations and a maintenance site for rolling stock and infrastructure

- 26 km of tunnels (23 of which on line and 3 for access to the maintenance site)

- Long trains (6 cars)

- 2 timetables 2025 and 2030

L16 - Saint Denis Pleyel / Noisy Champs:

- 9 stations

- Approximately 31 km of tunnels (including tunnels connecting to maintenance sites and line 17 connections)

L17 - Le Bourget RER / Mesnil-Amelot:

- 6 stations

-21 km of track

-Short trains (3 cars)

- 2 Sections 2023/2024 and 2030

L18 - Orly Airport / Versailles Chantiers:

- 10 stations

- 35 km (parts in tunnel and parts in viaduct)

- Highly contrasting territories

- Short trains with BOA type trainsets (3-car configuration)

You are interested in this product ? Leave us your address and phone number to be contacted again by our services.

Name *

First name *

Company *

Postcode *

E-mail *

Tel *

* Please fill all the compulsory fields

Mission of CERTIFER

Certifer carries out an OQA (Organisme Qualifié Agréé) mission in the following disciplines

Global System

  • Organizational, methodological and technical aspects contributing to the safe development of the system,
  • Methodology adopted for the identification of external, natural and technological risks,
  • Interfaces between the different subsystems.

Rolling Stock, including Rolling Stock and Infrastructure Maintenance Vehicles (VMI)

  • Body - Bearing - guidance,
  • Traction - braking,
  • On-board electrical safety systems.

Infrastructure

  • Civil Engineering - Solidity;
  • Civil engineering - Fire safety, evacuation and emergency response;
  • Equipment - Fire safety, evacuation and implementation of emergency services;
  • Platform, tracks and turnouts ;
  • Strength of platform facades (METRO)

Energy, including electrical traction energy in the following aspects:

  • Electrical safety ;
  • Mechanical strength.

Control-Command and Signalling including :

  • Command and control;
  • Railway signalling.
  • Control system for the opening of landing doors (METRO)

Operational subsystems:

  • Processing of safety requirements identified during the development of the system and exported to operations and maintenance

As well as the evaluation of the measures to be taken to ensure, in safety, the automatic driving of trains on the maintenance sites (SMR), with respect to the personnel and the other trains or Infrastructure Maintenance Vehicles (VMI ).

No additional info

You could also be interested in the following products :

Top
Dear users, this website stores cookies on your computer. Their purpose is to improve your website experience while providing you with more personalized services. Cookies are also used for ads personalisation.

If you would like more information about the cookies we use, please see our Privacy Policy. By accepting cookies, you consent to their use. You can also adjust their settings. If you refuse cookies, your information will not be tracked when you visit this site. Only one cookie will be used in your browser to remember your preference not to be tracked.
Deny all
Personalize
Accept all
Edit cookies setting