CERTIFER SA
18, Rue Edmond Membrée
 |  59300  Valenciennes  |  Plan d'accès

Customer: Concessionária do VLT Carioca S/A  (operator)
Place of execution: Rio De Janeiro (Brazil)
Project duration : 2016
Team: 1 Project Manager and 8 assessors

PROJECT’S DESCRIPTION:

The Rio de Janeiro tramway is a set of 3 tramway lines located in the city of Rio de Janeiro in Brazil, inaugurated and partially opened on 5 June 2016 on a 6 km section then shortly before the 2016 Summer Olympic Games on a 7 km section. In 2017, it must have a length of 28 kilometres and 31 stations.

Vous êtes intéressé par ce produit ? Laissez-nous vos coordonnées pour être recontacté par nos services.

Nom *

Prénom *

Société *

Code postal *

E-mail *

Téléphone *

* Veuillez remplir tous les champs obligatoires

CERTIFER's missions

Certifer has carried out an ISA mission by ensuring that the safety goals of each sub-system is met at all times during its lifetime and by verifying compliance with the regulations, standards and best practices of the system designed and implemented.

The ISA mission covered the following aspects:

  • Railway and civil works
  • Urban insertion and roads signaling
  • Rolling stock
  • Power supply Systems
  • Control-Command & Signaling
  • Telecommunications
  • Tramway’s operation and maintenance
  • Global system
Pas d'infos supplémentaires
Article(s) similaire(s)

Vous pourriez également être intéressé par les produits suivants :

Top