CERTIFER SA
18, Rue Edmond Membrée
 |  59300  Valenciennes  |  Plan d'accès

Customer: ALSTOM
Location : Sydney,  Australia
The project duration: 2015– 2019

Project's description

For this new 12 km long line [2], Alstom is responsible for the integrated tramway system which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams,  power supply equipment, including APS -ground power supply- over two kilometres, signalling systems, the energy recovery system HESOP, depot equipment and maintenance. 

Vous êtes intéressé par ce produit ? Laissez-nous vos coordonnées pour être recontacté par nos services.

Nom *

Prénom *

Société *

Code postal *

E-mail *

Téléphone *

* Veuillez remplir tous les champs obligatoires

CERTIFER's missions

The subsystems assessed for LIGHT RAIL Sydney tram system i.e. “System ISA” are the Design and Construction contractor (D&C) work, i.e. following ones:

  • System (Design, Safety and implementation),
  • Infrastructure (Design, Safety, Implementation),
  • Structure (bridges, tunnels) (Design, Safety, Implementation),
  • Power Supply and OCS (Design, Safety and Implementation),
  • APS (Design, Safety and Implementation),
  • Rolling Stock (only dynamic testing and Trial runs),
  • Signalling - (only Installation and commissioning),
  • Urban insertion Traffic Control Light Signals. and the interfaces between these different systems.
Pas d'infos supplémentaires
Article(s) similaire(s)

Vous pourriez également être intéressé par les produits suivants :

Top