Customer:Roads & Transport Authority
Location : Dubai, United Arab Emirates
The project duration: 2016– 2020

Project's description

Route2020 Metro Rail Project, a 14.5-kilometer above-ground and 3.5-kilometer underground extension of the Dubai Metro which starts from Nakheel Harbour and Tower Metro Station on the Red Line, to connect the Expo site. Out of the seven stations, five will be elevated and two underground. Travel time from Dubai Marina to the Expo site will be 16 minutes.

Vous êtes intéressé par ce produit ? Laissez-nous vos coordonnées pour être recontacté par nos services.

Nom *

Prénom *

Société *

Code postal *

E-mail *

Téléphone *

* Veuillez remplir tous les champs obligatoires

CERTIFER's missions

The systems included in the assessment comprises :

  • Rolling Stock (RS),
  • Operation Control System (OCS)
  • Automatic Train Control (ATC)
  • Power Supply and Distribution System (PDS), including 3rd rail
  • Communication Systems(COM)
  • Platform Screen Doors (PSD)
  • Automatic Fare Collection (AFC)
  • Depot Equipment (DEQ)
  • Civil Works, including over-ground, at-grade and underground works
  • Mechanical, Electrical & Plumbing, including services and utilities
  • Permanent Ways
  • Fire and Life Safety
  • Electromagnetic Compatibility
  • Software Safety
Pas d'infos supplémentaires
Article(s) similaire(s)

Vous pourriez également être intéressé par les produits suivants :

Top