Customer: Consortium FAST
Location : Riyadh, Saudi Arabia
The project duration: 2014– 2019

Project's description

Line 4: The length of the line is around 29.6 km and it features 8 stations (3 common with Line 6), in addition to 1 transfer station with Lines 1 and 6.

Line 5: The length of the line is about 12.9 km and it features 10 stations, in addition to 2 transfer stations with Lines 1 and 2.

Line 6: The length of the line is approximately 30 km and it features 8 stations (3 common with Line 4), in addition to 3 transfer stations with Lines1,2 and 3

Vous êtes intéressé par ce produit ? Laissez-nous vos coordonnées pour être recontacté par nos services.

Nom *

Prénom *

Société *

Code postal *

E-mail *

Téléphone *

* Veuillez remplir tous les champs obligatoires

CERTIFER's missions

The systems included in the assessment comprises :

  • Rolling Stock;
  • Power Supply;
  • Control-Command & Signaling;
  • Platform Screen Doors;
  • Interface Management;
  • Safety Management;
  • Risk Evaluation;
  • Operation ;
  • Maintenance.